As a framework contractor working with the leading OEM’s, CASC have been responsible for mobilising some of the world’s largest offshore wind farms, providing a full mechanical and electrical site fit out across the globe.
Their expertise includes access and safety, project management, site operations and training, alongside the supply of mobile switch rooms to provide full site power generation. Onsite services incorporate the construction of large bespoke structures for the preassembly of wind turbines, heavy lifting operations, and design, manufacture, and installation of ancillary components.
A dedicated in-house engineering team with a unique suite of technology have capabilities including 5 axis waterjet profiling, tube and fibre laser cutting, cold metal forming, and fabrication of mild steel, aluminium and stainless steel. They are experienced in working across a range of industry sectors – renewable energy, construction, electrical and access and safety throughout the UK, Europe, Asia and the US.
Projects
Greater Changhua
This project will be the biggest wind-power complex in Taiwan and will power approximately 2.8 million households. CASC’s power containers will be used for the construction and pre-commissioning of the turbines on the project.
Hornsea 2
At over 1.3 GW, Hornsea 2 has overtaken Hornsea 1 as the world’s biggest offshore wind farm, and CASC were responsible for the site preparations for the mobilisation of 165 Siemens Gamesa turbines. CASC were also involved with the Hornsea 1 project, and together, both sites will produce enough power for over 2.3 million homes.